IS WORK OVER?

Automation index

How much of a Traffic engineer’s job can AI already do?

A microsim comes earlier. The junction not killing anyone without painting an extra lane do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Traffic engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Counts, the model and the microsim.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Junction, the timings and the pedestrian.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the diversion and not choking the neighbourhood.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the councillor and not painting the miracle lane.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The crash, the figure and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the junction does not kill, and not painting extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • microsims
  • counts
  • junction timings
  • pedestrians
  • diversions
  • councillors
  • crashes
  • lanes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 179Materials engineer27%
  2. 180Renewables engineer27%
  3. 181Requirements engineer27%
  4. 183Hydraulic engineer27%
  5. 184Textile engineer27%
  6. 185Immunologist27%