Automation index
How much of a Train conductor’s job can AI already do?
A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Train conductor
21%
AI can already do 21% of this job.
#514 / 743
View rankingTrain conductor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Consist, brakes and the departure sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Platform, close-up and the one left outside.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Incidents, Control and the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Ticket staff, the fare dodger and the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the points and not leaving early.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Leave nobody behind, and sign the consist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- train consist
- platform close-up
- departure sheet
- Control
- brake check
- line incidents
- halts
- delays
Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312
IS WORK OVER?
Corrosion engineer
22%
#387 / 743
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145