IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Demand planner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Forecast, promotions and bias.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Safety stock, lead time and the order.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Sales, the spike and the promo nobody flagged.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
S&OP, consensus and the fight over numbers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The supplier who fails and not covering with air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Neither empty nor drowned, and not inflating the forecast.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demand forecast
  • safety stock
  • lead time
  • S&OP
  • promotions
  • forecast bias
  • supplier orders
  • empty shelf

Sources for this job· O*NET 13-1081.00· ESCO/ISCO 2421

Analyse my job

Jobs with similar scores

  1. 432Illustrator21%
  2. 433Waterproofer21%
  3. 434Solar installer21%
  4. 436Marine engineer21%
  5. 437Mediator21%
  6. 438Musician21%