IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 528Illustrator21%
  2. 529Waterproofer21%
  3. 530Solar installer21%
  4. 532Marine engineer21%
  5. 533Mediator21%
  6. 534Musician21%