IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 423Illustrator21%
  2. 424Waterproofer21%
  3. 425Solar installer21%
  4. 427Marine engineer21%
  5. 428Mediator21%
  6. 429Musician21%