IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 432Illustrator21%
  2. 433Waterproofer21%
  3. 434Solar installer21%
  4. 436Marine engineer21%
  5. 437Mediator21%
  6. 438Musician21%