IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Kitchen fitter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, measures and the module breakdown.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Level, hang and the plinth that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Worktop, sink and the edge that chips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Appliances, openings and the service visit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the tap change and the extra day.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Doors that shut, and not leaving the misalignment.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit kitchens
  • level modules
  • worktops
  • hang units
  • plinths
  • appliance housings
  • sinks
  • breakdown

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Analyse my job

Jobs with similar scores

  1. 423Illustrator21%
  2. 424Waterproofer21%
  3. 425Solar installer21%
  4. 427Marine engineer21%
  5. 428Mediator21%
  6. 429Musician21%