IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

SAP specialist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Customising, specs and module tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Integrations, IDocs and interface faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Key user, training and resistance.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Go-lives and windows.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, authorisations and audit.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a company unable to invoice.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Customising, specs and module tests
  • Integrations, IDocs and interface faults
  • Key user, training and resistance
  • Go-lives and windows
  • Documentation, authorisations and audit
  • Not leaving a company unable to invoice
  • especialista sap
  • consultor sap
  • erp specialist

Sources for this job· O*NET 15-1211.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 432Illustrator21%
  2. 433Waterproofer21%
  3. 434Solar installer21%
  4. 436Marine engineer21%
  5. 437Mediator21%
  6. 438Musician21%