IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

School secretary

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Enrolment, places and the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
File, the transfer and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Certificate, the signature and not rushing a stamp.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Family, the hatch and the one who shouts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspection, the register and not losing the paper.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the file is there, and not losing a child.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • enrolment
  • school files
  • certificates
  • transfers
  • the hatch
  • school registers
  • places
  • stamps

Sources for this job· O*NET 43-6014.00· ESCO/ISCO 4120

Analyse my job

Jobs with similar scores

  1. 461Illustrator21%
  2. 462Waterproofer21%
  3. 463Solar installer21%
  4. 465Marine engineer21%
  5. 466Mediator21%
  6. 467Musician21%