IS WORK OVER?

Automation index

How much of a Train conductor’s job can AI already do?

A consist sheet comes earlier. Running the train without leaving a passenger at the halt do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Shutter installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order and the box that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Box, axle and the motor in the opening.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tape, slats and the one that derails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Program the remote and the limit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the inner courtyard and not scratching the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it runs true, and not leaving a lame box.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measure shutters
  • fit boxes
  • shutter motors
  • slats
  • limit switches
  • tape
  • program remotes
  • axles

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Analyse my job

Jobs with similar scores

  1. 423Illustrator21%
  2. 424Waterproofer21%
  3. 425Solar installer21%
  4. 427Marine engineer21%
  5. 428Mediator21%
  6. 429Musician21%