IS WORK OVER?

Automation index

How much of a Train driver’s job can AI already do?

A diagram and a log come earlier. Stopping a train full of people does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Train driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, notices and train logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, brake and obey signals.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Incidents, passengers and radio.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Fitness, fatigue and rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Shunting, depots and couplings.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Not running a red or a platform.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Diagrams, notices and train logs
  • Drive, brake and obey signals
  • Incidents, passengers and radio
  • Fitness, fatigue and rules
  • Shunting, depots and couplings
  • Not running a red or a platform
  • maquinista
  • train driver
  • conductor de tren

Sources for this job· O*NET 53-4011.00· ESCO/ISCO 8311

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 696Civil Guard officer18%
  2. 697Gas fitter18%
  3. 698Gardener18%
  4. 700Shellfish gatherer18%
  5. 701Stonemason18%
  6. 702Port crane operator18%