Automation index
How much of a Transplant coordinator’s job can AI already do?
A donor protocol comes earlier. Talking to the family at three in the morning do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Transplant coordinator
22%
AI can already do 22% of this job.
#365 / 733
View rankingTransplant coordinator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Alert, the donor and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
ICU, brain death and the one who doubts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Family, three in the morning and not pushing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logistics, the retrieval team and the plane.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Theatre, the ischaemia time and not losing the organ.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Talk to the family, and not pushing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- donors
- brain death
- family consent
- retrieval teams
- ischaemia time
- ICU
- organ logistics
- not push
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2269
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142