Automation index
How much of a Treasurer’s job can AI already do?
A cash forecast comes earlier. Having liquidity on Friday without lying to the bank do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Treasurer
27%
AI can already do 27% of this job.
#189 / 623
View rankingTreasurer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cash, forecast and the maturities.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Banks, facilities and the one that does not land.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Payments, the supplier and the one that waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Board, the report and not dressing cash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The crunch, confirming and not hiding the hole.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Liquidity on Friday, and not lying to the bank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cash forecast
- maturities
- facilities
- supplier payments
- confirming
- liquidity
- banks
- board report
Sources for this job· O*NET 11-3031.00· ESCO/ISCO 1211
IS WORK OVER?
Electrical engineer
25%
#236 / 623
View rankingElectrical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, single-line diagram and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Project, quantities and electrical spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Site, contractors and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Measurements, thermography and faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Code, quality and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign and own the installation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- Project, quantities and electrical spec
- Site, contractors and commissioning
- Measurements, thermography and faults
- Code, quality and documentation
- Sign and own the installation
- ingeniero electrico
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151