Automation index
How much of a University tutor’s job can AI already do?
A tutoring form comes earlier. Them not dropping the degree and asking for help in time do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
University tutor
27%
AI can already do 27% of this job.
#230 / 753
View rankingUniversity tutor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Form, the file and the one who does not come.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Mark, the cut and the one who gives up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Grant, the paper and not letting it lapse.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Health, the referral and not playing clinician.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The dean, the dropout figure and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they ask for help, and not dropping out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- university tutoring
- degree dropout
- grants
- files
- health referral
- the dean
- grade cuts
- tutoring forms
Sources for this job· O*NET 25-1199.00· ESCO/ISCO 2310
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115