IS WORK OVER?

Automation index

How much of a UX designer’s job can AI already do?

Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.

This percentage does not predict how many people will lose their jobs.

Task comparison

UX designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flows and wireframes
Estimate

No public source provides a precise figure. This is our estimate.

35%70%+24.5
Tests and synthesis
Estimate

No public source provides a precise figure. This is our estimate.

25%50%+12.5
System and judgment
Estimate

No public source provides a precise figure. This is our estimate.

25%25%+6.3
Team workshops
Estimate

No public source provides a precise figure. This is our estimate.

15%15%+2.3
Total100%46%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • work ergonomically
  • understand artistic concepts
  • safeguard artistic quality of performance
  • analyse score
  • monitor sociological trends
  • draw up lighting plan
  • assess power needs

Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166

Aerial technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, levels and install logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Roof, mast, cable and outlet.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Configure, tune and explain to the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Community, porter and access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Faults, building ICT and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not falling and not leaving a building without the match.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, levels and install logs
  • Roof, mast, cable and outlet
  • Community, porter and access
  • Faults, building ICT and fibre
  • antenista
  • instalador de antenas
  • aerial technician

Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422

Analyse my job

Jobs with similar scores

  1. 01Translator52%
  2. 02Financial analyst51%
  3. 04Paralegal44%
  4. 05Data analyst40%
  5. 06Data scientist40%