Automation index
How much of a UX designer’s job can AI already do?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
UX designer
46%
AI can already do 46% of this job.
#3 / 623
View rankingUX designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flows and wireframesEstimateNo public source provides a precise figure. This is our estimate. | 35% | 70% | +24.5 |
Tests and synthesisEstimateNo public source provides a precise figure. This is our estimate. | 25% | 50% | +12.5 |
System and judgmentEstimateNo public source provides a precise figure. This is our estimate. | 25% | 25% | +6.3 |
Team workshopsEstimateNo public source provides a precise figure. This is our estimate. | 15% | 15% | +2.3 |
| Total | 100% | 46% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design interfaces
- prototypes
- figma
- work ergonomically
- understand artistic concepts
- safeguard artistic quality of performance
- analyse score
- monitor sociological trends
- draw up lighting plan
- assess power needs
Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166
IS WORK OVER?
Crane operator
16%
#595 / 623
View rankingCrane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lift plan, radii and weights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Run the crane and place the load.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Signals, wind and exclusion zone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, foreman and maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, inspections and machine tests.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a load over someone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Lift plan, radii and weights
- Run the crane and place the load
- Signals, wind and exclusion zone
- Site, foreman and maintenance
- Logs, inspections and machine tests
- Not leaving a load over someone
- gruista
- operador de grua
- crane operator
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343