Automation index
How much of a UX designer’s job can AI already do?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
UX designer
46%
AI can already do 46% of this job.
#3 / 753
View rankingUX designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flows and wireframesEstimateNo public source provides a precise figure. This is our estimate. | 35% | 70% | +24.5 |
Tests and synthesisEstimateNo public source provides a precise figure. This is our estimate. | 25% | 50% | +12.5 |
System and judgmentEstimateNo public source provides a precise figure. This is our estimate. | 25% | 25% | +6.3 |
Team workshopsEstimateNo public source provides a precise figure. This is our estimate. | 15% | 15% | +2.3 |
| Total | 100% | 46% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design interfaces
- prototypes
- figma
- work ergonomically
- understand artistic concepts
- safeguard artistic quality of performance
- analyse score
- monitor sociological trends
- draw up lighting plan
- assess power needs
Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165