IS WORK OVER?

Automation index

How much of a UX designer’s job can AI already do?

Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.

This percentage does not predict how many people will lose their jobs.

Task comparison

UX designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flows and wireframes
Estimate

No public source provides a precise figure. This is our estimate.

35%70%+24.5
Tests and synthesis
Estimate

No public source provides a precise figure. This is our estimate.

25%50%+12.5
System and judgment
Estimate

No public source provides a precise figure. This is our estimate.

25%25%+6.3
Team workshops
Estimate

No public source provides a precise figure. This is our estimate.

15%15%+2.3
Total100%46%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • work ergonomically
  • understand artistic concepts
  • safeguard artistic quality of performance
  • analyse score
  • monitor sociological trends
  • draw up lighting plan
  • assess power needs

Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 01Translator52%
  2. 02Financial analyst51%
  3. 04Paralegal44%
  4. 05Data analyst40%
  5. 06Data scientist40%