Automation index
How much of a UX designer’s job can AI already do?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
UX designer
46%
AI can already do 46% of this job.
#3 / 763
View rankingUX designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flows and wireframesEstimateNo public source provides a precise figure. This is our estimate. | 35% | 70% | +24.5 |
Tests and synthesisEstimateNo public source provides a precise figure. This is our estimate. | 25% | 50% | +12.5 |
System and judgmentEstimateNo public source provides a precise figure. This is our estimate. | 25% | 25% | +6.3 |
Team workshopsEstimateNo public source provides a precise figure. This is our estimate. | 15% | 15% | +2.3 |
| Total | 100% | 46% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design interfaces
- prototypes
- figma
- work ergonomically
- understand artistic concepts
- safeguard artistic quality of performance
- analyse score
- monitor sociological trends
- draw up lighting plan
- assess power needs
Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166
IS WORK OVER?
Tunnel engineer
22%
#410 / 763
View rankingTunnel engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Heading, the geology and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Water, the inflow and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Blast, the vibration and the building.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Segment, the ring and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not come down, and not hiding the water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tunnel headings
- support
- inflows
- blasts
- segments
- tunnel geology
- rings
- vibrations
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142