IS WORK OVER?

Automation index

How much of a UX designer’s job can AI already do?

Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.

This percentage does not predict how many people will lose their jobs.

Task comparison

UX designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flows and wireframes
Estimate

No public source provides a precise figure. This is our estimate.

35%70%+24.5
Tests and synthesis
Estimate

No public source provides a precise figure. This is our estimate.

25%50%+12.5
System and judgment
Estimate

No public source provides a precise figure. This is our estimate.

25%25%+6.3
Team workshops
Estimate

No public source provides a precise figure. This is our estimate.

15%15%+2.3
Total100%46%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • work ergonomically
  • understand artistic concepts
  • safeguard artistic quality of performance
  • analyse score
  • monitor sociological trends
  • draw up lighting plan
  • assess power needs

Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Analyse my job

Jobs with similar scores

  1. 01Translator52%
  2. 02Financial analyst51%
  3. 04Paralegal44%
  4. 05Data analyst40%
  5. 06Data scientist40%