Automation index
How much of a UX designer’s job can AI already do?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
UX designer
46%
AI can already do 46% of this job.
#3 / 633
View rankingUX designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flows and wireframesEstimateNo public source provides a precise figure. This is our estimate. | 35% | 70% | +24.5 |
Tests and synthesisEstimateNo public source provides a precise figure. This is our estimate. | 25% | 50% | +12.5 |
System and judgmentEstimateNo public source provides a precise figure. This is our estimate. | 25% | 25% | +6.3 |
Team workshopsEstimateNo public source provides a precise figure. This is our estimate. | 15% | 15% | +2.3 |
| Total | 100% | 46% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design interfaces
- prototypes
- figma
- work ergonomically
- understand artistic concepts
- safeguard artistic quality of performance
- analyse score
- monitor sociological trends
- draw up lighting plan
- assess power needs
Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166
IS WORK OVER?
Wind-turbine technician
19%
#536 / 633
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412