IS WORK OVER?

Automation index

How much of a Varnisher’s job can AI already do?

A colour card comes earlier. A finish that does not show the grain the wrong way does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Varnisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Colour cards, ranges and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sand, stain, apply and dry.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Booth, filters and dust.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Cabinetmaker, deadlines and touch-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Repairs in the home and on site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not delivering a piece with orange peel.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Colour cards, ranges and orders
  • Sand, stain, apply and dry
  • Booth, filters and dust
  • Cabinetmaker, deadlines and touch-up
  • Repairs in the home and on site
  • Not delivering a piece with orange peel
  • barnizador
  • lacador
  • varnisher

Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7522

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 560Dog trainer18%
  2. 561Forest ranger18%
  3. 562Aerial technician18%
  4. 564Wildland firefighter18%
  5. 565Commercial diver18%
  6. 566Camera operator18%