Automation index
How much of a Varnisher’s job can AI already do?
A colour card comes earlier. A finish that does not show the grain the wrong way does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Varnisher
18%
AI can already do 18% of this job.
#683 / 763
View rankingVarnisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Colour cards, ranges and orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sand, stain, apply and dry.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Booth, filters and dust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Cabinetmaker, deadlines and touch-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Repairs in the home and on site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not delivering a piece with orange peel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Colour cards, ranges and orders
- Sand, stain, apply and dry
- Booth, filters and dust
- Cabinetmaker, deadlines and touch-up
- Repairs in the home and on site
- Not delivering a piece with orange peel
- barnizador
- lacador
- varnisher
Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7522
IS WORK OVER?
Gas network engineer
22%
#406 / 763
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145