IS WORK OVER?

Automation index

How much of a Varnisher’s job can AI already do?

A colour card comes earlier. A finish that does not show the grain the wrong way does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Varnisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Colour cards, ranges and orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sand, stain, apply and dry.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Booth, filters and dust.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Cabinetmaker, deadlines and touch-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Repairs in the home and on site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not delivering a piece with orange peel.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Colour cards, ranges and orders
  • Sand, stain, apply and dry
  • Booth, filters and dust
  • Cabinetmaker, deadlines and touch-up
  • Repairs in the home and on site
  • Not delivering a piece with orange peel
  • barnizador
  • lacador
  • varnisher

Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7522

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 670Dog trainer18%
  2. 671Forest ranger18%
  3. 672Aerial technician18%
  4. 674Wildland firefighter18%
  5. 675Commercial diver18%
  6. 676Camera operator18%