Automation index
How much of a Varnisher’s job can AI already do?
A colour card comes earlier. A finish that does not show the grain the wrong way does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Varnisher
18%
AI can already do 18% of this job.
#663 / 743
View rankingVarnisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Colour cards, ranges and orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sand, stain, apply and dry.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Booth, filters and dust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Cabinetmaker, deadlines and touch-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Repairs in the home and on site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not delivering a piece with orange peel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Colour cards, ranges and orders
- Sand, stain, apply and dry
- Booth, filters and dust
- Cabinetmaker, deadlines and touch-up
- Repairs in the home and on site
- Not delivering a piece with orange peel
- barnizador
- lacador
- varnisher
Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7522
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142