Automation index
How much of a Varnisher’s job can AI already do?
A colour card comes earlier. A finish that does not show the grain the wrong way does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Varnisher
18%
AI can already do 18% of this job.
#553 / 633
View rankingVarnisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Colour cards, ranges and orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sand, stain, apply and dry.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Booth, filters and dust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Cabinetmaker, deadlines and touch-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Repairs in the home and on site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not delivering a piece with orange peel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Colour cards, ranges and orders
- Sand, stain, apply and dry
- Booth, filters and dust
- Cabinetmaker, deadlines and touch-up
- Repairs in the home and on site
- Not delivering a piece with orange peel
- barnizador
- lacador
- varnisher
Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7522
IS WORK OVER?
Structural engineer
26%
#204 / 633
View rankingStructural engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, combinations and the calculation annex.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Site, rebar and what was not poured that way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Code, building regs and the sizing note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Pathology, the crack and shore or not.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The architect, the deadline and not trimming the depth.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sign that it stands, and not hiding the assumption.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calculate structures
- frame model
- calculation annex
- building regs
- rebar
- structural pathology
- load combinations
- shore
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142