IS WORK OVER?

Automation index

How much of a VFX artist’s job can AI already do?

A previz comes earlier. Integrating the shot without seeing the trick do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

VFX artist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Previz, tracking and the asset.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Comp, light and the edge that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Sim, smoke and the one that has no weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Review, notes and the one that comes back again.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The deadline, the farm and not faking the render.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the trick does not show, and delivering the shot.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • previz
  • tracking
  • comp shots
  • sims
  • reviews
  • render farm
  • assets
  • edges

Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 130Real estate agent27%
  2. 131Investment analyst27%
  3. 132Tactical analyst27%
  4. 134Astronomer27%
  5. 135Banker27%
  6. 136Bid manager27%