IS WORK OVER?

Automation index

How much of a VFX artist’s job can AI already do?

A previz comes earlier. Integrating the shot without seeing the trick do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

VFX artist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Previz, tracking and the asset.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Comp, light and the edge that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Sim, smoke and the one that has no weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Review, notes and the one that comes back again.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The deadline, the farm and not faking the render.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the trick does not show, and delivering the shot.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • previz
  • tracking
  • comp shots
  • sims
  • reviews
  • render farm
  • assets
  • edges

Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 130Real estate agent27%
  2. 131Investment analyst27%
  3. 132Tactical analyst27%
  4. 134Astronomer27%
  5. 135Banker27%
  6. 136Bid manager27%