Automation index
How much of a VFX artist’s job can AI already do?
A previz comes earlier. Integrating the shot without seeing the trick do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
VFX artist
27%
AI can already do 27% of this job.
#133 / 633
View rankingVFX artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Previz, tracking and the asset.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Comp, light and the edge that shows.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Sim, smoke and the one that has no weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Review, notes and the one that comes back again.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The deadline, the farm and not faking the render.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the trick does not show, and delivering the shot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- previz
- tracking
- comp shots
- sims
- reviews
- render farm
- assets
- edges
Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166
IS WORK OVER?
Tower crane operator
18%
#573 / 633
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343