Automation index
Can AI do the work of a Video editor?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
No number on this site decides whether someone keeps or loses their job.
Task comparison
IS WORK OVER?
Video editor
28%
AI or a robot can already do 28% of this job.
#59 / 103
View rankingVideo editor
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Select and combine the most effective shots of each scene to form a logical and smoothly running story.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Edit films and videotapes to insert music, dialogue, and sound effects, to arrange films into sequences, and to correct errors, using editing equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Set up and operate computer editing systems, electronic titling systems, video switching equipment, and digital video effects units to produce a final product.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Organize and string together raw footage into a continuous whole according to scripts or the instructions of directors and producers.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Review footage sequence by sequence to become familiar with it before assembling it into a final product.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Mark frames where a particular shot or piece of sound is to begin or end.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Verify key numbers and time codes on materials.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Cut shot sequences to different angles at specific points in scenes, making each individual cut as fluid and seamless as possible.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 48% | 28% | +13.4 |
| Total | 100% | 28% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- personal directing styles
- film production process
- graphic design
- motion graphics
- ICT software specifications
- multimedia systems
- follow work schedule
- consult with producer
- watch scenes
- put uncut recordings into computer
Sources for this job· O*NET 27-4032.00· ESCO/ISCO 2654
IS WORK OVER?
Mason
15%
#98 / 103
View rankingMason
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source pins this saving. It is an estimate of the method. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source pins this saving. It is an estimate of the method. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source pins this saving. It is an estimate of the method. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112