Automation index
How much of a Virologist’s job can AI already do?
A PCR comes earlier. Isolating the virus without contaminating the lab do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Virologist
22%
AI can already do 22% of this job.
#479 / 733
View rankingVirologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PCR, cultures and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Isolate, biosafety and the one that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Outbreak, sequence and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Public health, the note and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The clinician, the antiviral and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Isolate, and not contaminating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- virus PCR
- cultures
- biosafety
- sequence outbreaks
- isolate virus
- public-health notes
- antivirals
- P3 lab
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142