Automation index
How much of a Virologist’s job can AI already do?
A PCR comes earlier. Isolating the virus without contaminating the lab do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Virologist
22%
AI can already do 22% of this job.
#409 / 643
View rankingVirologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PCR, cultures and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Isolate, biosafety and the one that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Outbreak, sequence and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Public health, the note and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The clinician, the antiviral and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Isolate, and not contaminating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- virus PCR
- cultures
- biosafety
- sequence outbreaks
- isolate virus
- public-health notes
- antivirals
- P3 lab
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Mason
15%
#627 / 643
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112