Automation index
How much of a Virologist’s job can AI already do?
A PCR comes earlier. Isolating the virus without contaminating the lab do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Virologist
22%
AI can already do 22% of this job.
#400 / 633
View rankingVirologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PCR, cultures and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Isolate, biosafety and the one that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Outbreak, sequence and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Public health, the note and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The clinician, the antiviral and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Isolate, and not contaminating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- virus PCR
- cultures
- biosafety
- sequence outbreaks
- isolate virus
- public-health notes
- antivirals
- P3 lab
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Nuclear engineer
24%
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149