Automation index
How much of a Virologist’s job can AI already do?
A PCR comes earlier. Isolating the virus without contaminating the lab do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Virologist
22%
AI can already do 22% of this job.
#462 / 713
View rankingVirologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PCR, cultures and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Isolate, biosafety and the one that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Outbreak, sequence and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Public health, the note and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The clinician, the antiviral and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Isolate, and not contaminating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- virus PCR
- cultures
- biosafety
- sequence outbreaks
- isolate virus
- public-health notes
- antivirals
- P3 lab
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Residential porter
19%
#600 / 713
View rankingResidential porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the letterboxes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hall, the neighbour and the one who is not.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fault, the water and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Move, the lift and not scratching.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The residents, the complaint and not taking sides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there when it floods, and not losing the master.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fault sheets
- master key
- the hall
- letterboxes
- floods
- moves
- the residents
- not take sides
Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629