Automation index
How much of a Virologist’s job can AI already do?
A PCR comes earlier. Isolating the virus without contaminating the lab do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Virologist
22%
AI can already do 22% of this job.
#400 / 633
View rankingVirologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PCR, cultures and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Isolate, biosafety and the one that breaks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Outbreak, sequence and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Public health, the note and not delaying.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The clinician, the antiviral and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Isolate, and not contaminating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- virus PCR
- cultures
- biosafety
- sequence outbreaks
- isolate virus
- public-health notes
- antivirals
- P3 lab
Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131
IS WORK OVER?
Shutter installer
19%
#501 / 633
View rankingShutter installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, order and the box that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Box, axle and the motor in the opening.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Tape, slats and the one that derails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Program the remote and the limit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the inner courtyard and not scratching the frame.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it runs true, and not leaving a lame box.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure shutters
- fit boxes
- shutter motors
- slats
- limit switches
- tape
- program remotes
- axles
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115