Automation index
How much of a Voice actor’s job can AI already do?
A take and a lipsync tweak come earlier. Getting into the skin in a booth does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Voice actor
20%
AI can already do 20% of this job.
#544 / 753
View rankingVoice actor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Takes, lipsync and a first tweak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Perform in the booth and hold takes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Director, take and not fighting the line.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Voice, care and shouting days.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Diary, agents and life between studios.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not leaving a take that does not match the mouth.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Takes, lipsync and a first tweak
- Perform in the booth and hold takes
- Director, take and not fighting the line
- Voice, care and shouting days
- Diary, agents and life between studios
- doblador
- dobladora
- voice actor
Sources for this job· O*NET 27-2011.00· ESCO/ISCO 2655
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115