IS WORK OVER?

Automation index

How much of a Voice actor’s job can AI already do?

A take and a lipsync tweak come earlier. Getting into the skin in a booth does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Voice actor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Takes, lipsync and a first tweak.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Perform in the booth and hold takes.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Director, take and not fighting the line.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Voice, care and shouting days.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Diary, agents and life between studios.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not leaving a take that does not match the mouth.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Takes, lipsync and a first tweak
  • Perform in the booth and hold takes
  • Director, take and not fighting the line
  • Voice, care and shouting days
  • Diary, agents and life between studios
  • doblador
  • dobladora
  • voice actor

Sources for this job· O*NET 27-2011.00· ESCO/ISCO 2655

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 446Dietitian20%
  2. 447Chief executive20%
  3. 448DJ20%
  4. 450Social educator20%
  5. 451Operating room nurse20%
  6. 452ICU nurse20%