Automation index
How much of a Wall tiler’s job can AI already do?
A joint set-out comes earlier. No ugly cut and holding the water do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Wall tiler
19%
AI can already do 19% of this job.
#476 / 633
View rankingWall tiler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and the tile format.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Adhesive, set and the tray fall.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cut, drill and the tile that splits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grout, seal and the bath junction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the model change and the stock that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No ugly cut, and no leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tile walls
- set out joints
- bed tiles
- tray fall
- seal junctions
- cut tiles
- drill tile
- grout
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146