Automation index
How much of a Wall tiler’s job can AI already do?
A joint set-out comes earlier. No ugly cut and holding the water do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Wall tiler
19%
AI can already do 19% of this job.
#565 / 743
View rankingWall tiler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and the tile format.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Adhesive, set and the tray fall.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cut, drill and the tile that splits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grout, seal and the bath junction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the model change and the stock that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No ugly cut, and no leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tile walls
- set out joints
- bed tiles
- tray fall
- seal junctions
- cut tiles
- drill tile
- grout
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122
IS WORK OVER?
Safety engineer
22%
#393 / 743
View rankingSafety engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
HAZOP, nodes and the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the scenario and the one that was not thought.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
SIL, the valve and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the lesson and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Management, the cost and not yielding the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop, and not signing the risk that kills.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- HAZOP
- nodes
- SIL
- safety valves
- incidents
- interlocks
- safety minutes
- not jump
Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141