Automation index
How much of a Warehouse supervisor’s job can AI already do?
A dock dashboard comes earlier. Getting the shift out without mixing the goods do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Warehouse supervisor
24%
AI can already do 24% of this job.
#309 / 753
View rankingWarehouse supervisor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Docks, waves and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The team, the peak and the one who cannot keep up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stock, shrink and the mystery gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Safety, forklifts and the near miss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late haulier and not mixing the docks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Get the shift out, and not mixing the goods.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plan docks
- waves
- warehouse shift
- shrink
- forklifts
- near misses
- outbound peaks
- mixed goods
Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115