IS WORK OVER?

Automation index

How much of a Warehouse supervisor’s job can AI already do?

A dock dashboard comes earlier. Getting the shift out without mixing the goods do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Warehouse supervisor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Docks, waves and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The team, the peak and the one who cannot keep up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Stock, shrink and the mystery gap.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Safety, forklifts and the near miss.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late haulier and not mixing the docks.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Get the shift out, and not mixing the goods.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plan docks
  • waves
  • warehouse shift
  • shrink
  • forklifts
  • near misses
  • outbound peaks
  • mixed goods

Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 303Nuclear engineer24%
  2. 304Health inspector24%
  3. 305Interpreter24%
  4. 307Jeweller24%
  5. 308Intercultural mediator24%
  6. 309Internist24%