IS WORK OVER?

Automation index

How much of a Warehouse supervisor’s job can AI already do?

A dock dashboard comes earlier. Getting the shift out without mixing the goods do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Warehouse supervisor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Docks, waves and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The team, the peak and the one who cannot keep up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Stock, shrink and the mystery gap.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Safety, forklifts and the near miss.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late haulier and not mixing the docks.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Get the shift out, and not mixing the goods.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plan docks
  • waves
  • warehouse shift
  • shrink
  • forklifts
  • near misses
  • outbound peaks
  • mixed goods

Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 301Nuclear engineer24%
  2. 302Health inspector24%
  3. 303Interpreter24%
  4. 305Jeweller24%
  5. 306Intercultural mediator24%
  6. 307Internist24%