Automation index
How much of a Waste technician’s job can AI already do?
A waste code comes earlier. The waste going where it should, not the next bin, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Waste technician
22%
AI can already do 22% of this job.
#464 / 733
View rankingWaste technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Code, characterise and the paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the mix and the one you cannot.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Move, the haulier and the note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspection, the tip and not hiding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The producer, the saving and not diluting.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Where it should, not next door.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waste codes
- characterise waste
- transfer notes
- the tip
- mixing
- producers
- waste papers
- not dilute
Sources for this job· O*NET 19-4042.00· ESCO/ISCO 2143
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142