IS WORK OVER?

Automation index

How much of a Waste technician’s job can AI already do?

A waste code comes earlier. The waste going where it should, not the next bin, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waste technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Code, characterise and the paper.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the mix and the one you cannot.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Move, the haulier and the note.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspection, the tip and not hiding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The producer, the saving and not diluting.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Where it should, not next door.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • waste codes
  • characterise waste
  • transfer notes
  • the tip
  • mixing
  • producers
  • waste papers
  • not dilute

Sources for this job· O*NET 19-4042.00· ESCO/ISCO 2143

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 398Maintenance technician22%
  2. 399Environmental technician22%
  3. 400Metrology technician22%
  4. 402Irrigation technician22%
  5. 403Semiconductor technician22%
  6. 404Telephony technician22%