Automation index
How much of a Waste technician’s job can AI already do?
A waste code comes earlier. The waste going where it should, not the next bin, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Waste technician
22%
AI can already do 22% of this job.
#392 / 633
View rankingWaste technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Code, characterise and the paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the mix and the one you cannot.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Move, the haulier and the note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspection, the tip and not hiding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The producer, the saving and not diluting.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Where it should, not next door.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waste codes
- characterise waste
- transfer notes
- the tip
- mixing
- producers
- waste papers
- not dilute
Sources for this job· O*NET 19-4042.00· ESCO/ISCO 2143
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146