Automation index
How much of a Waste technician’s job can AI already do?
A waste code comes earlier. The waste going where it should, not the next bin, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Waste technician
22%
AI can already do 22% of this job.
#392 / 633
View rankingWaste technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Code, characterise and the paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the mix and the one you cannot.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Move, the haulier and the note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspection, the tip and not hiding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The producer, the saving and not diluting.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Where it should, not next door.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- waste codes
- characterise waste
- transfer notes
- the tip
- mixing
- producers
- waste papers
- not dilute
Sources for this job· O*NET 19-4042.00· ESCO/ISCO 2143
IS WORK OVER?
Shutter installer
19%
#501 / 633
View rankingShutter installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, order and the box that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Box, axle and the motor in the opening.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Tape, slats and the one that derails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Program the remote and the limit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the inner courtyard and not scratching the frame.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it runs true, and not leaving a lame box.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- measure shutters
- fit boxes
- shutter motors
- slats
- limit switches
- tape
- program remotes
- axles
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115