IS WORK OVER?

Automation index

How much of a Waste technician’s job can AI already do?

A waste code comes earlier. The waste going where it should, not the next bin, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waste technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Code, characterise and the paper.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the mix and the one you cannot.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Move, the haulier and the note.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspection, the tip and not hiding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The producer, the saving and not diluting.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Where it should, not next door.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • waste codes
  • characterise waste
  • transfer notes
  • the tip
  • mixing
  • producers
  • waste papers
  • not dilute

Sources for this job· O*NET 19-4042.00· ESCO/ISCO 2143

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 389Maintenance technician22%
  2. 390Environmental technician22%
  3. 391Metrology technician22%
  4. 393Irrigation technician22%
  5. 394Semiconductor technician22%
  6. 395Telephony technician22%