IS WORK OVER?

Automation index

How much of a Wastewater-plant operator’s job can AI already do?

A flow comes earlier. Coming out clean without losing the sludge do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Physicist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Simulate, fit and reduce data.
Estimate

No public source provides a precise figure. This is our estimate.

22%50%+11
Draft papers, posters and proposals.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the experiment and the apparatus.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Measure in the lab or in the field.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Argue with the group and peer-review.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win machine time and funding.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Simulate, fit and reduce data
  • Draft papers, posters and proposals
  • Design the experiment and the apparatus
  • Measure in the lab or in the field
  • Argue with the group and peer-review
  • Win machine time and funding
  • fisico
  • physicist

Sources for this job· O*NET 19-2012.00· ESCO/ISCO 2111

Analyse my job

Jobs with similar scores

  1. 516Neurosurgeon19%
  2. 517Power-plant operator19%
  3. 518Demolition worker19%
  4. 520Concrete finisher19%
  5. 521Piling operator19%
  6. 522Recycling-plant operator19%