IS WORK OVER?

Automation index

How much of a Wastewater-plant operator’s job can AI already do?

A flow comes earlier. Coming out clean without losing the sludge do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Set designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
The reading, references and the space concept.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, model, 3D and the element list.
Estimate

No public source provides a precise figure. This is our estimate.

18%32%+5.8
Build, workshop and fit-up in the room or on set.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rehearsals, changes and what direction asks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Budget, props and the trades.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
That it stands, reads, and comes down.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design sets
  • make models
  • set drawings
  • fit up
  • props
  • space concept
  • set 3D
  • stage fit-up

Sources for this job· O*NET 27-1027.00· ESCO/ISCO 3432

Analyse my job

Jobs with similar scores

  1. 526Neurosurgeon19%
  2. 527Power-plant operator19%
  3. 528Demolition worker19%
  4. 530Concrete finisher19%
  5. 531Piling operator19%
  6. 532Recycling-plant operator19%