IS WORK OVER?

Automation index

How much of a Wastewater-plant operator’s job can AI already do?

A flow comes earlier. Coming out clean without losing the sludge do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Tiler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Layout, levels and ordering tile.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, set and grout.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Substrates, falls and awkward points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not staining the house.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and logs.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a floor that sounds hollow.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Layout, levels and ordering tile
  • Cut, set and grout
  • Substrates, falls and awkward points
  • Site, client and not staining the house
  • Quantities, extras and logs
  • Not leaving a floor that sounds hollow
  • solador

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122

Analyse my job

Jobs with similar scores

  1. 526Neurosurgeon19%
  2. 527Power-plant operator19%
  3. 528Demolition worker19%
  4. 530Concrete finisher19%
  5. 531Piling operator19%
  6. 532Recycling-plant operator19%